Concrete Now!
Concrete Now!5.0
Introducing Concrete Now: the ultimate app for construction pros! Calculate concrete volume, temperature, evaporation, carbon footprint, and fiber dosage. Optimize projects, reduce costs, achieve exceptional results. Elevate your expertise with innovative tools for construction. Download now and sta
Installeren
MasterAtlas
MasterAtlas-
When connected to the appropriate data sources and/or IoT devices, MasterAtlas provides accurate information and real time data that you can compare to target properties while in the field. This will help you ensure high levels of quality control, create efficiencies and optimize the workflow for yo
Installeren
UGC Annulus Grout
UGC Annulus Grout-
The TBM Annulus Grout App calculates the weight and volume of components A and B per cubic meter of grout, as well as retarders and water required. Additionally, the App calculates laboratory scale volumes required for lab or site trials.
Installeren
UGC Dosage Control
UGC Dosage Control-
The Dosage Control App for underground construction helps to set the input parameters for sprayed concrete machines by calculating the accelerator dosage in % of cement weight or liter/minute depending on the mix design, dosage parameters and pump parameters. The pump rate can be determined based on
Installeren
UGC Early Strength
UGC Early Strength-
The Early Strength App for underground construction calculates the early strength of sprayed concrete up to a level of 1 MPa based on penetration needle results. The calculation background is the Austrian Guideline on Sprayed Concrete and the EN 14488-2 “Compressive Strength of young Sprayed Concret
Installeren
UGC Soil Conditioning
UGC Soil Conditioning-
The TBM Soil Conditioning App calculates the quantities of foaming agent, water, and air needed to reach the required foaming volume per minute, per ring and for the total length of tunnel, taking into consideration parameters such as advance rate, TBM diameter, foaming agent or polymer concentratio
Installeren
UGC Injection Grout
UGC Injection Grout-
The Injection Grout App for underground construction calculates the amount of grout based on the amount of cement, water and plasticizer at different water/ cement ratios.
Installeren
UGC Tail Seal Grease
UGC Tail Seal Grease-
The Tail Seal Grease Consumption App calculates the estimated grease consumption, based on the tunnel dimensions, length & diameter.
Installeren
TBM Annulus Grout
TBM Annulus Grout-
The TBM Annulus Grout App calculates the weight and volume of components A and B per cubic meter of grout, as well as retarders and water required. Additionally, the App calculates laboratory scale volumes required for lab or site trials.
Installeren
Dosage Control
Dosage Control-
The Dosage Control App for underground construction helps to set the input parameters for sprayed concrete machines by calculating the accelerator dosage in % of cement weight or liter/minute depending on the mix design, dosage parameters and pump parameters. The pump rate can be determined based on
Installeren
Early Strength
Early Strength-
The Early Strength App for underground construction calculates the early strength of sprayed concrete up to a level of 1 MPa based on penetration needle results. The calculation background is the Austrian Guideline on Sprayed Concrete and the EN 14488-2 “Compressive Strength of young Sprayed Concret
Installeren
Injection Grout
Injection Grout-
The Injection Grout App for underground construction calculates the amount of grout based on the amount of cement, water and plasticizer at different water / cement ratios.
Installeren
Tail Seal Grease
Tail Seal Grease-
(TSG) consumption calculator – The Tail Seal Grease Consumption App calculates the estimated grease consumption, based on the tunnel dimensions, length & diameter.
Installeren
TBM Soil Conditioning
TBM Soil Conditioning-
The TBM Soil Conditioning App calculates the quantities of foaming agent, water, and air needed to reach the required foaming volume per minute, per ring and for the total length of tunnel, taking into consideration parameters such as advance rate, TBM diameter, foaming agent or polymer concentratio